This video presentation discusses challenges inherent to LNG piping, including large diameters, cryogenic temperatures, stainless steel materials, and large D/T ratios. It also covers various items which are not addressed by the B31 codes.
Robert has over 15 years’ experience in the mechanical engineering industry with proven expertise in mechanical and piping design. His most recent role was Lead Piping Engineer for INPEX on the Ichthys LNG Plant. Previously, he served as the client technical authority for the Chevron Wheatstone Downstream Project for all LNG plant piping and onshore pipeline, providing technical support on design, construction and commissioning.